|
Posted by Ron on July 17, 2007, 11:23 am
> The last lumber package for my back porch project just arrived.
> I have to get 8 sheets of 3/4" T&G plywood from the driveway, 150 feet
> away to the porch roof, 10' above the lower floor, which is 6' above
> the existing grade.
> The stuff weighs about 50 pounds a sheet and I'm working alone.
> Any ideas on how to get it up there?
>
> (oh yeah, its raining too)
One at a time over your head (hence no need for rain gear).
You can thank me later for brilliant idea <BFG>
Ron
|