Compacting crushed stone foundation G 11-18-2008
If you were  Registered and logged in, you could reply and use other advanced thread options
Posted by G on November 18, 2008, 12:52 pm
I'm laying a shed foundation of 3/4" crushed stone. Due to levelling
issues, I'll be putting down around 12" depth of it (about 7 yards total
crushed stone in a 144 sq. foot area).

Question:
-If I rent a jumping jack for the weekend (around $91), am I ok putting
ALL the crushed stone down and THEN compacting it w/ the jumping jack
all at once?

-Or do I need to put a few inches down, compact it, put a few more
inches, compact it, etc...?

I've never used a jumping jack before so I don't know if the vibration
can penetrate into 12" of crushed stone or if I need to do it in layers.

Thanks!

Posted by EXT on November 18, 2008, 1:09 pm
Don't use a jumping jack they are hard to handle, use a plate vibrator to
set the gravel in layers about 4" thick. They come in various sizes, but an
average rental one should be fine to pack the gravel.

I was compacting about 3 feet of granular material for a driveway extension
and rented some equipment, a Bobcat to move the material and a large plate
vibrator to pack it. The one they sent was a diesel powered unit that
weighed close to 1000 pounds, it really packed the gravel, impossible to
move unless it was running, but not hard when it was vibrating. Had to be
careful as it would like to aim into low areas and it would take all my
strength to get it back where I wanted it.


> I'm laying a shed foundation of 3/4" crushed stone. Due to levelling
> issues, I'll be putting down around 12" depth of it (about 7 yards total
> crushed stone in a 144 sq. foot area).
> Question:
> -If I rent a jumping jack for the weekend (around $91), am I ok putting
> ALL the crushed stone down and THEN compacting it w/ the jumping jack
> all at once?
> -Or do I need to put a few inches down, compact it, put a few more
> inches, compact it, etc...?
> I've never used a jumping jack before so I don't know if the vibration
> can penetrate into 12" of crushed stone or if I need to do it in layers.
> Thanks!


Posted by Cwatters on November 18, 2008, 1:30 pm

> I'm laying a shed foundation of 3/4" crushed stone. Due to levelling
> issues, I'll be putting down around 12" depth of it (about 7 yards total
> crushed stone in a 144 sq. foot area).

Use a vibrating plate..
http://img.alibaba.com/photo/11328754/Vibrating_Plate_Compactor.jpg
They pull themselves along when running. I would do it in at least two goes
and recheck the levels between.









Posted by jloomis on November 18, 2008, 7:24 pm
Doing the compaction in "lifts" is best....Some water may be needed too with
the compaction, but too much will create problems.....
I would use an ashalt vibratory plate from a rental.....
Or a whacker....flat plate tamper...gas operated...
A jumping jack as I know it, is a small round flat headed like jackhammer
that pounds the dirt......for trenches etc....
Anyway, do it in a 6'lift with little moisture...
jloomis
> I'm laying a shed foundation of 3/4" crushed stone. Due to levelling
> issues, I'll be putting down around 12" depth of it (about 7 yards total
> crushed stone in a 144 sq. foot area).
> Question:
> -If I rent a jumping jack for the weekend (around $91), am I ok putting
> ALL the crushed stone down and THEN compacting it w/ the jumping jack
> all at once?
> -Or do I need to put a few inches down, compact it, put a few more
> inches, compact it, etc...?
> I've never used a jumping jack before so I don't know if the vibration
> can penetrate into 12" of crushed stone or if I need to do it in layers.
> Thanks!



Posted by TonyG on November 18, 2008, 9:03 pm
G wrote:
> I'm laying a shed foundation of 3/4" crushed stone. Due to levelling
> issues, I'll be putting down around 12" depth of it (about 7 yards total
> crushed stone in a 144 sq. foot area).
>
> Question:
> -If I rent a jumping jack for the weekend (around $91), am I ok putting
> ALL the crushed stone down and THEN compacting it w/ the jumping jack
> all at once?
>
> -Or do I need to put a few inches down, compact it, put a few more
> inches, compact it, etc...?
>
> I've never used a jumping jack before so I don't know if the vibration
> can penetrate into 12" of crushed stone or if I need to do it in layers.
>
> Thanks!
See if your local concrete supplier has a product called consolidated
fill. Its a mix of flyash and cement. I understand it is self compacting
to about 95%. It dries like very hard sand. For a shed it should be
fine.TonyG

Page 1 of 2       1 2 > last >>
Similar ThreadsPosted
Mulch substitute -- crushed brick ?? May 30, 2007, 10:03 pm
Cultured Stone August 25, 2006, 9:58 pm
wood or stone? August 26, 2006, 3:32 pm
Manufactured Stone November 7, 2006, 11:38 am
cultured stone question again. September 6, 2006, 1:07 am
Building outside steps with stone ?? February 27, 2007, 6:17 pm
Cost of laying stone? March 22, 2007, 5:39 pm
cultured stone v. brick(costs) October 23, 2006, 12:11 pm
Find you stone suppliers in www.stonechina.cn! November 30, 2006, 7:38 am
Image Stone Fireplace Surrounds October 7, 2009, 11:55 pm

Contact Us | Privacy Policy

XML SitemapXML Sitemap