Posted by dpb on October 18, 2007, 7:33 pm
PeterD wrote:
> wrote:
>
>
>> The more I think about it, I might try digging down beneath them, and
>> hopefully lower them a little.
>
> Personally, I don't like that idea... If you were to do that, I'd say
> rip the old ones out, dig new holes deeper and pour new (and larger?)
> piers as appropriate. I don't think the piers would be stable if you
> try to dig under then and drop them down.
As if they are now? :)
But the point is valid. There's no point whatsoever in stopgap measure
that I can see other than simply removing the tall one and putting in
the right sized one for the temporary. Rather than repeat, I'll
reference my other response.
--
|