Posted by Erik Dillenkofer on November 21, 2006, 5:24 am
As long as you can maintain 12" of clearance between all utilities, they can
go in the same trench. We routinely run 13.2 KV primary cable (in conduit)
in the same trench as water, telephone, CATV, and gas ... in Florida. Best
bet is to check with your power company and see if they require greater
clearance. Some utilities have their own standards which exceed the NESC
requirements.
> By "high voltage" I meant the power before the transformer which could
> be 1000 volts or higher. They (power co.) will have to place a
> transformer near the location of the new house. The 800 ft. or so
> before the transformer is the area where I want to run the water with
> the power. Thanks for the replies.
> Erik Dillenkofer wrote:
>> As long as you can maintain 12" of clearance between the utilities, they
>> can
>> all be installed in the same trench.
>>
>> > Can anyone tell me if you can run high-voltage powerlines and a water
>> > supply line in the same ditch? I need to run power, water & telephone
>> > lines underground 800 ft. and would like to dig only one ditch if
>> > possible. Thanks Jack Kuusisto bodega8687@yahoo.com
>> >
>
|