Posted by Glenn on May 11, 2008, 6:04 pm
Chances are the job is fine as is.
Have you tried bribery?
>I forgot to schedule for wire lath inspection and I
>went ahead and applied the stucco coats. During the
>final inspection, the inspection caught it and asked
>that I expose a couple of spots to check the nailing
>and he determined that the wire lath was under-nailed
>ad asked that I should fix and left open for me. Is
>there any way I can increase the nailing after the
>fact?
> thanks
> a.a.
>
|