Posted by on April 14, 2007, 11:29 am
>Can anyone advise me on the installation of hydronic coils before a slab
>is poured ?
>
>We are building a new home and I have costed the Rehau 16mm PEX totalling
>$6,000 for 550 sqm. This is working on 5m per sqm equalling 2750m.
>
>On a sqm basis this is approx $11 however every quotation I have received
>is approx $50-$55 per sqm to supply & lay the pipe prior to having the
>slab poured.
>
>So it will cost me upwards of $21,450 for the installer to design the
>layout and attach the pipe to the mesh prior to the pour !
>
>As it cannot be rocket science and well worth the savings are there any
>DIY guides available for potential pitfalls and design etc.
>
>Thanks in advance...