If you were Registered and logged in, you could reply and use other advanced thread options
|
Posted by DRM on August 5, 2005, 3:34 am
Hello all,
I'm trying to finish up my attached deck. The deck surface is 3 feet
above the ground where I intend to place the steps. My question is, given
that the end of the deck furthest from the wall is supported by three
columns that sit on 4-1/2' concrete piers, do I also need to dig (and pour)
4-1/2' deep holes for each of the three stringers to land on? Or can I get
away with a 6" thick slab? If a slab, what would be the minimum width and
length? Do I have to bolt the bottom og the stringer to the cement or is it
enough to anchor the tops of the stringers to the deck rim joist? Thanks
for any suggestions!
|
|
Posted by Mikepier on August 6, 2005, 4:40 am
I don't think you need to put a footing for each stringer. Generally ,
it would be ideal on a slab, but I've seen people use those brick and
patio pavers in the dirt as a footing.
As far as anchoring, I used a joist hanger for each stringer at the
top. On the bottom, you should put some kind of anchoring. If you are
using a slab, just anchor each stringer to the slab. Or if you are
putting posts at the bottom for the railing, anchor the stringer to the
posts, and the posts to the ground. But in general, the top anchoring
is most important.
|
|
Posted by DRM on August 6, 2005, 4:37 pm
> I don't think you need to put a footing for each stringer. Generally ,
> it would be ideal on a slab, but I've seen people use those brick and
> patio pavers in the dirt as a footing.
> As far as anchoring, I used a joist hanger for each stringer at the
> top. On the bottom, you should put some kind of anchoring. If you are
> using a slab, just anchor each stringer to the slab. Or if you are
> putting posts at the bottom for the railing, anchor the stringer to the
> posts, and the posts to the ground. But in general, the top anchoring
> is most important.
Thanks for your reply Mikepier, I wonder if you could answer a
couple more questions...
How far should the slab extend the stringers? (What are the dimensions
of the slab knowing that the width of the steps is 6 feet? And would
4 stringers suffice?)
If the deck is on frost piers, won't the slab move with the ground?
(I'm just trying to understand why the steps wouldn't be pulled from
the deck's rim joist if they are anchored at both the slab and the deck.)
Thanks again for your help!
Dale
|
|
Posted by Mikepier on August 6, 2005, 11:27 am
4 stringers should be enough for a 6 foot wide stairs. If you are using
2X6 as treads, then that means they will span appox. 20" between each
stringer. The max you can span with 2X6 is I believe 24". And make sure
you use 2X12's for stringers, not 2X 10's like some people I've seen.
I'm not sure what frost piers are. Are those the piers that look like
elephant feet for a floating deck? Also what is at the ground level of
the deck, grass?
|
|
Posted by DRM on August 6, 2005, 6:50 pm
>4 stringers should be enough for a 6 foot wide stairs. If you are using
> 2X6 as treads, then that means they will span appox. 20" between each
> stringer. The max you can span with 2X6 is I believe 24". And make sure
> you use 2X12's for stringers, not 2X 10's like some people I've seen.
> I'm not sure what frost piers are. Are those the piers that look like
> elephant feet for a floating deck? Also what is at the ground level of
> the deck, grass?
A frost pier is just another name for a cement column that extends past
the frost line. They keep the deck from heaving with the season changes.
Mine have a 19" diameter (overkill) and are 5' in length (4-1/2' deep with
6" extending out of the ground). The deck is attached to the house and
supported on the other end by 6x6 posts anchored to three of these piers.
And yes, the ground level is grass.
Thanks,
Dale
|
Page 1 of 2 1 2 > last >>
| Similar Threads | Posted | | Deck over screen porch attached to house | June 5, 2006, 2:57 pm |
| Building steps | May 17, 2009, 6:53 pm |
| Re: Building steps | May 18, 2009, 10:52 am |
| Building steps with stone ?? | February 27, 2007, 6:26 pm |
| Building Shower Pans - 7 Steps! | October 3, 2007, 8:38 am |
| Reasonable price for building a few steps? | September 13, 2008, 2:49 pm |
| Trex deck/steps - how clean and stain? | June 17, 2007, 12:52 pm |
| BUILDING A DECK | January 5, 2007, 10:24 pm |
| Building a deck on top of a slab | September 28, 2006, 11:29 pm |
| Building a deck over a slab | September 28, 2006, 11:32 pm |
|
|
> it would be ideal on a slab, but I've seen people use those brick and
> patio pavers in the dirt as a footing.
> As far as anchoring, I used a joist hanger for each stringer at the
> top. On the bottom, you should put some kind of anchoring. If you are
> using a slab, just anchor each stringer to the slab. Or if you are
> putting posts at the bottom for the railing, anchor the stringer to the
> posts, and the posts to the ground. But in general, the top anchoring
> is most important.