If you were Registered and logged in, you could reply and use other advanced thread options
|
Posted by Frank Robinette on May 24, 2008, 7:52 pm
Hey:
Ok Tiling a shower, and the homeowner requested me to tackle the
plumbing also..Ok no problem I do it all the time, but they have
handed me a box of Kohler body spray tiles,wall mtd shower
heads,mixing valves, ect.. I have no problem handling it, but the
shower is on the 2nd floor, and stubbed with 1/2 supply.. and getting
3/4 to it is SERIOUS.
My question is will 1/2 supply enough flow for 3 spray tiles,and 3
shower heads? and as usual time is ticking.. any advice will be much
appreciated people
Thanks Frank
|

| |
Posted by Kickin' Ass and Takin' Names on May 24, 2008, 7:00 pm
wrote:
> Hey:
>
> Ok Tiling a shower, and the homeowner requested me to tackle the
> plumbing also..Ok no problem I do it all the time, but they have
> handed me a box of Kohler body spray tiles,wall mtd shower
> heads,mixing valves, ect.. I have no problem handling it, but the
> shower is on the 2nd floor, and stubbed with 1/2 supply.. and getting
> 3/4 to it is SERIOUS.
>
> My question is will 1/2 supply enough flow for 3 spray tiles,and 3
> shower heads? and as usual time is ticking.. any advice will be much
> appreciated people
>
> Thanks =A0 =A0Frank
I'm NOT trying to be a wise-ass -- call Kohler????
|
|
Posted by Frank Robinette on May 24, 2008, 7:56 pm
On Sat, 24 May 2008 16:00:37 -0700 (PDT), "Kickin' Ass and Takin'
>wrote:
>> Hey:
>>
>> Ok Tiling a shower, and the homeowner requested me to tackle the
>> plumbing also..Ok no problem I do it all the time, but they have
>> handed me a box of Kohler body spray tiles,wall mtd shower
>> heads,mixing valves, ect.. I have no problem handling it, but the
>> shower is on the 2nd floor, and stubbed with 1/2 supply.. and getting
>> 3/4 to it is SERIOUS.
>>
>> My question is will 1/2 supply enough flow for 3 spray tiles,and 3
>> shower heads? and as usual time is ticking.. any advice will be much
>> appreciated people
>>
>> Thanks Frank
>
>I'm NOT trying to be a wise-ass -- call Kohler????
thought about it, but it is memorial day weekend
|
|
Posted by Wayne Boatwright on May 24, 2008, 7:47 pm
On Sat 24 May 2008 04:56:50p, Frank Robinette told us...
> On Sat, 24 May 2008 16:00:37 -0700 (PDT), "Kickin' Ass and Takin'
>
>>wrote:
>>> Hey:
>>>
>>> Ok Tiling a shower, and the homeowner requested me to tackle the
>>> plumbing also..Ok no problem I do it all the time, but they have
>>> handed me a box of Kohler body spray tiles,wall mtd shower
>>> heads,mixing valves, ect.. I have no problem handling it, but the
>>> shower is on the 2nd floor, and stubbed with 1/2 supply.. and getting
>>> 3/4 to it is SERIOUS.
>>>
>>> My question is will 1/2 supply enough flow for 3 spray tiles,and 3
>>> shower heads? and as usual time is ticking.. any advice will be much
>>> appreciated people
>>>
>>> Thanks Frank
>>
>>I'm NOT trying to be a wise-ass -- call Kohler????
>
>
> thought about it, but it is memorial day weekend
>
And this is a weekend job, right? My guess is that to provide enough
velocity from all the heads, you'll either need rather high pressure or a
larger feed. Having all that installed would have me believe these folks
don't want a wimpy shower.
--
Wayne Boatwright
-------------------------------------------
Saturday, 05(V)/24(XXIV)/08(MMVIII)
-------------------------------------------
Countdown till Memorial Day
1dys 7hrs 15mins
-------------------------------------------
'Those were the days, My Friends, We
thought, They'd never END'....
-------------------------------------------
|
|
Posted by Frank Robinette on May 24, 2008, 8:54 pm
On Sat, 24 May 2008 23:47:27 GMT, Wayne Boatwright
>On Sat 24 May 2008 04:56:50p, Frank Robinette told us...
>
>> On Sat, 24 May 2008 16:00:37 -0700 (PDT), "Kickin' Ass and Takin'
>>
>>>wrote:
>>>> Hey:
>>>>
>>>> Ok Tiling a shower, and the homeowner requested me to tackle the
>>>> plumbing also..Ok no problem I do it all the time, but they have
>>>> handed me a box of Kohler body spray tiles,wall mtd shower
>>>> heads,mixing valves, ect.. I have no problem handling it, but the
>>>> shower is on the 2nd floor, and stubbed with 1/2 supply.. and getting
>>>> 3/4 to it is SERIOUS.
>>>>
>>>> My question is will 1/2 supply enough flow for 3 spray tiles,and 3
>>>> shower heads? and as usual time is ticking.. any advice will be much
>>>> appreciated people
>>>>
>>>> Thanks Frank
>>>
>>>I'm NOT trying to be a wise-ass -- call Kohler????
>>
>>
>> thought about it, but it is memorial day weekend
>>
>
>And this is a weekend job, right? My guess is that to provide enough
>velocity from all the heads, you'll either need rather high pressure or a
>larger feed. Having all that installed would have me believe these folks
>don't want a wimpy shower.
They saw a Brochure and just went crazy.. and I have 2 weeks for the
job which includes moving a wall elect/plumbing/tile ect
|
Page 1 of 2 1 2 > last >>
| Similar Threads | Posted | | Custom Shower Pan with Membrane (Threshold Question) | October 12, 2006, 12:28 am |
| Custom Shower Floor | January 12, 2007, 9:18 am |
| Plumbing Question - Bathtub Shower Pipes | February 20, 2007, 4:46 pm |
| water proofing a custom shower pan. | September 26, 2008, 12:06 am |
| How to replace shower plumbing. | April 10, 2006, 9:28 am |
| Basic Plumbing for shower install | May 7, 2006, 2:25 am |
| Concrete question (regarding previous plumbing question) | October 17, 2006, 2:29 pm |
| Re: PEX Plumbing Question | June 13, 2005, 5:32 pm |
| Plumbing question.... | January 4, 2006, 8:58 am |
| Plumbing Question | July 9, 2006, 3:11 pm |
|
|