Posted by on December 14, 2006, 2:08 pm
Goedjn wrote:
> On 13 Dec 2006 20:31:43 -0800, edavid3001@gmail.com wrote:
>
> >First contractor -- paid ~$1400 for wood to frame basement. As soon as
> >wood arrived, he passed this job onto another contractor.
> >
> >We are 6 months into it and the second contractor has done most all of
> >the framing with some minor areas needing boxed & the inspectors minor
> >changes.
> >
> >He's also ran electrical, though I did have to pay another electrician
> >$1000 to finish up pre-framing electric work. I paid to have the
> >cable/phone/network ran myself.
> >
> >So this guy's done the framing for 1000 square feet, he has done
> >electric work, and he has purchased the drywall, tape, and mud. I
> >have since paid for a plumber..
> >
> >Anyway, this second guy walked off the job with $6000 paid to him. For
> >doing framing, some of the electrical, and purchasing the drywall
> >materials. He passed the job onto another person.
> >
> >I need to figure out how much what he did was worth, and I am not sure
> >how to do that. The drywall, while impressive looking down there, is
> >not that expensive afaik. We're talking maybe $500 for that material,
> >right? How can I try and calculate what the labor for the framing is
> >worth? It took him 6 months, but he would be gone for 3 weeks at a
> >time doing nothing to my basement. And then what the amount of
> >electrical work he did was worth? There is not an accounting of the
> >hours he worked so I can't simply do hours X $50 for example.
> >
> >This is a lower wage area, in a small US city.
> >
> >Thanks!
>
> If you have a contract, get someone else to finish, and
> pay the guy what walked whatever the difference is.
> If he wants more than that, make HIM justify it.
What does the guy say he wants? You've already paid $8500 to frame,
drywall and run electric to a 1000 sq ft basement area. That sounds
like plenty to me. The time to have established costs was upfront with
a written contract. Do you have anything in writing? Or what was the
verbal agreement you had?
|