Posted by Aaron Fude on November 30, 2008, 6:57 pm
Hi,
I need to increase the depth of a wall (currently open) and I'm
planning to do it essentially by nailing 2x2's to the existing studs.
My question is simle: should I also use an adhesive will just the
nails do?
Many thanks in advance,
Aaron
|
|
Posted by aemeijers on November 30, 2008, 7:24 pm
Aaron Fude wrote:
> Hi,
>
> I need to increase the depth of a wall (currently open) and I'm
> planning to do it essentially by nailing 2x2's to the existing studs.
> My question is simle: should I also use an adhesive will just the
> nails do?
>
> Many thanks in advance,
>
> Aaron
Depends what you plan to do with the wall. If you just need it deeper to
add more insulation or clear a vent stack, nailing 2x2s on the face is
fine, adhesive not really needed. If you are going to be hanging heavy
cabinets on it, I would extend the plates with 2x2, and then toenail in
2x4 or 2x6 studs next to the existing studs, with added blocking where
the cabinet rails will land. But that is just me- when in doubt,
over-build. The extra wood is cheaper than doing it twice.
--
aem sends...
|
|
Posted by Lp1331 1p1331 on November 30, 2008, 8:04 pm
2x2's actually cost more than 2x4's. You could put 2x4's across the
exisiting studs, but as has been said, it depends exactly what you are
going to do afterwards. Personally I would probably use screws,
especially if I didn't have a nail gun. If you have a table saw and a
little time you could rip 2x4's in half also, instead of buying 2x2's ,
unless the wall is only a couple of feet in which case it wouldn't be
enough to worry about. Larry
|
|
Posted by hr(bob) hofmann@att.net on November 30, 2008, 8:42 pm
On Nov 30, 7:04=A0pm, lp1...@webtv.net (Lp1331 1p1331) wrote:
> 2x2's actually cost more than 2x4's. You could put 2x4's across the
> exisiting studs, but as has been said, it depends exactly what you are
> going to do afterwards. Personally I would probably use screws,
> especially if I didn't have a nail gun. If you have a table saw and a
> little time you could rip 2x4's in half also, instead of buying 2x2's ,
> unless the wall is only a couple of feet in which case it wouldn't be
> enough to worry about. =A0 =A0Larry
I would run a bead of construction adhesive along the joint, and use
at least of couple of screws or nails to hold the studs together undil
the adhesive dries. Or, you could clamp them together if yuou have a
lot of clamps just sitting around doing nothing else.
|
|
Posted by Phisherman on December 1, 2008, 7:16 am
On Sun, 30 Nov 2008 15:57:49 -0800 (PST), Aaron Fude
>Hi,
>
>I need to increase the depth of a wall (currently open) and I'm
>planning to do it essentially by nailing 2x2's to the existing studs.
>My question is simle: should I also use an adhesive will just the
>nails do?
>
>Many thanks in advance,
>
>Aaron
Carpenter's yellow glue will give produce a much stronger joint.
|
| Similar Threads | Posted | | Framing a wall | September 15, 2007, 8:44 pm |
| Questions on framing wall near furnace | January 19, 2006, 8:14 am |
| re- framing wall / new shower pan install | June 18, 2007, 7:42 am |
| Wall Framing Question: Double Studs? | February 21, 2006, 9:38 pm |
| framing a 45 degree pantry wall... suggestions... ? | December 1, 2006, 8:59 pm |
| Door framing in load-bearing wall | June 18, 2007, 10:06 pm |
| Building a stucco over wood framing courtyard wall | February 11, 2006, 12:08 am |
| Okay if framing gets wet? | May 18, 2007, 1:36 pm |
| Framing for Shed | October 26, 2005, 2:06 pm |
| Framing and sheetrock | January 6, 2006, 8:11 pm |
|
|