|
Posted by Mark Lloyd on May 27, 2006, 12:23 pm
On Sat, 27 May 2006 00:37:06 GMT, "Xeno Chauvin"
>
>> Any idea what a
>> plumber charges for parts and labor (for 2 of them)?
>
>The last time I saw a sign in Home Depot ( Houston) their example was
>40 gal gas (G.E. I think) installed 495.00*
I just had one replaced (in east Texas) for about that.
>* Normal installation.
>Normal installation probably means,ground floor, direct access (no moving
>anything), no new inlet or outlet lines, no sweat fittings, no drain pan, no
>drain line, no new pop-off valve etc.
>Throwing all that in you're probably looking at $600.
>On two 52 gallon I'd say around $850.00 each would get it.
>AND you get to clean up after them for FREE!
>Xeno
>
>
--
Mark Lloyd
http://notstupid.laughingsquid.com
"Democracy is two wolves and a lamb voting on what
to have for lunch. Liberty is a well armed lamb
contesting the vote." - Benjamin Franklin
|