Home Page link

Has anyone ever used the concrete Molds for stepping stones???

Home Repair - - If it ain't broken, don't fix it. Otherwise look here. 

Page 2 of 2       << first < 1 2 Bookmark this page:  YahooMyWeb Yahoo!  Google Google  Windows Live Favorites Windows Live  del.icio.us del.icio.us  digg digg  Add to Netscape Netscape
Subject Author Date
Has anyone ever used the concrete Molds for stepping stones??? bdeditch 04-10-2007
If you were  Registered and logged in, you could reply and use other advanced thread options
Posted by bdeditch on April 11, 2007, 11:25 am


>
>
> > Just wondering on the experiences with using this type of step-up for
> > stepping stones. I am thinking of getting a mold and making my own.
> > Any hints or help would be helpful.
>
> Avoid the temptation to mix the concrete too wet and you should be fine.
>
> You will need enough molds to cast enough stones per batch so you don't have
> left over concrete after the molds are full, so you probably need to make
> smaller batches than a full sack of redimix.
>
> You can play with color and texture if you do it yourself.
>
> --
>
> Roger Shoaf
>
> About the time I had mastered getting the toothpaste back in the tube, then
> they come up with this striped stuff.

Ok I should have mentioned that the type that I want to use is the
stamp type. Where you set the mold on the area that you want, pour in
the cement and then wait a minute and lift it out. I was still
planning to lay a packed gravel base where it was going and add an
edging to hold it in and sweep in motor sand as well.


Posted by glyford@gmail.com on April 11, 2007, 2:44 pm


> Where you set the mold on the area that you want, pour in
> the cement and then wait a minute and lift it out.

I did this last summer.

Second the previous poster who said avoid getting it too wet. It
should be
very thick, not runny. If you can pour the mix in directly and level
it off, it's too runny for this application, and you'll have to wait
15 minutes to an hour for the concrete to set enough for you to pull
the mold. While that works and is relatively easy, it does require
you to have several molds on hand. There is a faster way if you're
willing to work at it.

Ideally, with a barely-wet-enough-to-work mix, once you've filled the
mold it should take some effort with a wooden trowel to get the stone
and gravel pushed down into the mix and force up enough finer mix to
be able to smooth off the top. Take any excess and throw it in the
mixer and start the next batch mixing, then come back, carefully
remove the mold, rinse it off, and place it for the next impression.
A rubber deadblow hammer helps to level the mold if your gravel bed
isn't perfect. You can also prop the mold up with pieces of gravel to
compensate for small dips. Have somewhere to rinse you mold and tools
where the runoff won't cause issues (don't turn your wife's favorite
flower bed into conrete from the runoff). Clean up around the already
cast blocks regularly so that you can get the mold tight against the
last row without stray gravel getting in your way.

It helps to be working on several rows at once, staggered, so that as
you screed off the top you don't mangle the one you just poured
previously. I got to where I could make about 4 impressions an hour
with only one mold.

After a reasonably harsh New England winter, the only blocks that
didn't hold up well are the ones where the stones were not worked down
well enough, leaving air pockets down low in the blocks which then
filled with water and froze, causing the blocks to disintegrate.

Also, for irregular edges and the like, have a couple of sheets of
plywood handy just bigger than the mold. Use these to pour extra
blocks, which are then fitted into your pattern where needed. If you
come back after about an hour, you can cut into these to fit for
curves and angles with a trowel. As they get harder, you can still
sort of cut them by chipping away at them, but they're very fragile at
that point, and it's easy to break them where you don't want. Once
fully cured you can cut them with either a brick chisel or a masonry
saw. In that case, make extra, they don't always break/cut clean.

Above all, be willing to experiment and be willing to throw away
something and start over if it's not working, it may take a little
trial and error to get what works for you.

Hope that's enough to get you started.
--Glenn Lyford


Page 2 of 2       << first < 1 2
Similar ThreadsPosted
stepping stones & new lawn July 30, 2005, 2:00 am
Concrete Mold for Stepping Stone Path August 2, 2005, 7:11 pm
Rubbing Stones Question April 15, 2006, 7:11 pm
laying paving stones 12" X 12" ? April 6, 2007, 11:30 am
Border necessary for paving stones? May 5, 2007, 8:17 pm
Replacing asphalt with interlocking stones July 28, 2005, 11:53 pm
Cleaning of blackened stones on fireplace ? January 6, 2007, 2:31 pm
Problem with paving stones on short walkway July 23, 2005, 5:53 pm
cold when stepping out of showers October 23, 2006, 9:16 am
Stepping off a ladder onto the roof November 5, 2006, 4:53 pm

Contact Us | Privacy Policy

XML SitemapXML Sitemap