Posted by Steve B on October 11, 2006, 10:13 pm
> Hello,
>
> I just set a couple of posts in concrete today, replacing two that went
> bad
> on me.
>
> How long should I let the concrete set up before I attach the rails and
> pickets (cedar rails, 6'x6" pickets) to the posts?
>
> This is in Western Oregon, BTW, where temps have been in the seventies for
> the last week, and the ground is dry.
>
> Thanks,
>
> Jon
>
3 days. 5 for a total cure.
|