|
Posted by Duane Bozarth on February 13, 2005, 8:10 pm
Edwin Pawlowski wrote:
>
> > We are installing our own kitchen cabinets. We are now at the stage where
> > we are going to install the crown moulding on top of the cabinets. The
> > moulding is presently in our below freezing garage (been there for about 2
> > weeks). Should we condition them moulding for a day or two before we cut
> > and install them? Due to expansion and contraction I'm worried that the
> > joints may not fit correctly after they adjust to the climate of the new
> > location....
> >
> > Comments / advice / suggestions / tips?
> >
> > Howie
>
> I'd bring them it at least a week ahead. Wood moves and moves slow.
And that would be more for moisture acclimation than the temperature...
|