|
Posted by Edwin Pawlowski on May 21, 2007, 10:28 pm
>I am building a 6' X 3' Walk in shower in a Co- Op which does require
> the use of a lead pan instead of Vinyl. My contractor informed me that
> the biggest sheet of lead is 4' X 4' and that he has to combine two
> sheets. But the problem is that he did not know how to make the seam
> water tight. Can anybody explain it to me?
Overlap the sheets and heat them. Lead will join together at the right
temperature. A large iron is better than a torch as you can get better
control. He should practice on the scrap cut off.
|