|
Posted by JohnnyC on July 20, 2007, 3:50 pm
My deck has a ledger board lagged into the band joist of the house. I am
going to build another deck to put a 3 season porch on top of it. I would
like the level of the new deck to be the same level as the door, which is
about 10 inches from the top of the existing ledger.
.
In this scenario, is the level of the deck raised? Do you build a frame on
top of the existing deck frame? I think I need to have the deck lagged into
the house because of the 3-season porch, but not sure. How do you guys do
this??
.
Thanks for your time.
|