|
Posted by johnnymo on September 28, 2006, 1:42 pm
Also...my hardwood runs into what is going to be the kitchen. Should I
wait and have the floors done once the cabinets are in? Or do the
floors before the cabinets. Remember that the floors in the kitchen
still have some adhesvie residue from the vinyl that use to cover it
until I ripped it up.
I was thinking, have them sand the floors (let the dust settle), then
have the cabinets installed and then have the coats of stain and poly
put on.
Thanks...
|