Posted by krw on February 12, 2007, 10:29 am
trader4@optonline.net says...
> wrote:
> > I would consider that a bad idea. Let the cement cure fully then use a
> > thinset or there recommended material.
> >
> > --
> > Joseph Meehan
> >
> > Dia 's Muire duit
> >
> >
> >
> >
> >
> > >I want to build 3" high cement base for my cabinet and wish to tile it
> > > as well. To save time can I put the tiles on the cement base before
> > > the cement is set/hardenend?
> >
> > > Thanks!- Hide quoted text -
> >
> > - Show quoted text -
>
> Not to mention, even if this were theoretically possible, what are you
> going to stand, if you tried to do this? With a concrete slab
> already cured, you stand on it and do a section of the tile at at
> time. With a whole floor concrete pour, then what????
>
Concrete base <> concrete floor.
--
Keith
|