Home Page link

Trenchless sewer lateral replacement - Impeded by heavy rains?

Home Repair - - If it ain't broken, don't fix it. Otherwise look here. 

Bookmark this page:  YahooMyWeb Yahoo!  Google Google  Windows Live Favorites Windows Live  del.icio.us del.icio.us  digg digg  Add to Netscape Netscape
Subject Author Date
Trenchless sewer lateral replacement - Impeded by heavy rains? Dan_Musicant 12-12-2006
If you were  Registered and logged in, you could reply and use other advanced thread options
Posted by Dan_Musicant on December 12, 2006, 1:07 pm


Late yesterday afternoon I faxed my signed bid to the company who first
bid on the job. Good references, by far the best price. Plus they
actually ran a camera through the existing line and didn't charge me a
cent. The other guys made their bids on the basis of inspection from
above, only.

Yesterday afternoon, when I faxed the bid, it was dry, but it rained
something fierce overnight. There had been relatively little rain here
until last night. Now the ground is going to be saturated. They have to
dig at least 4 holes to get down to the existing clay lateral for
connections and access to do the trenchless.

What affect does the rain have on all this? Thanks for your answers.

AppliancePartsPros.com, Inc.
Posted by dpb on December 12, 2006, 1:13 pm



Dan_Musicant wrote:
> Late yesterday afternoon I faxed my signed bid to the company who first
> bid on the job. Good references, by far the best price. Plus they
> actually ran a camera through the existing line and didn't charge me a
> cent. The other guys made their bids on the basis of inspection from
> above, only.
>
> Yesterday afternoon, when I faxed the bid, it was dry, but it rained
> something fierce overnight. There had been relatively little rain here
> until last night. Now the ground is going to be saturated. They have to
> dig at least 4 holes to get down to the existing clay lateral for
> connections and access to do the trenchless.
>
> What affect does the rain have on all this? Thanks for your answers.

Would seem to make much more sense to ask them... :(


Posted by Steve Barker LT on December 12, 2006, 5:46 pm


Why not ask the folks doing the job?

--
Steve Barker




> Late yesterday afternoon I faxed my signed bid to the company who first
> bid on the job. Good references, by far the best price. Plus they
> actually ran a camera through the existing line and didn't charge me a
> cent. The other guys made their bids on the basis of inspection from
> above, only.
>
> Yesterday afternoon, when I faxed the bid, it was dry, but it rained
> something fierce overnight. There had been relatively little rain here
> until last night. Now the ground is going to be saturated. They have to
> dig at least 4 holes to get down to the existing clay lateral for
> connections and access to do the trenchless.
>
> What affect does the rain have on all this? Thanks for your answers.



Posted by Dan_Musicant on December 13, 2006, 8:46 pm


On Tue, 12 Dec 2006 16:46:18 -0600, "Steve Barker LT"

:Why not ask the folks doing the job?

I did. I just thought it best to try to get impartial opinions. They did
call me back in response to my faxed bid. But the guy who did the
inspection and is going to set up the job hasn't called me. I figure
they're real busy with work because of the heavy rains. It's no biggie,
my having to wait. I jury rigged the biggest problem - a broken drain.


Posted by EXT on December 14, 2006, 11:26 am


If these guys are pros, they are used to working outside in all conditions.
It probably won't affect them one bit. Although the finished job may be a
little messier due to the mud.

> Late yesterday afternoon I faxed my signed bid to the company who first
> bid on the job. Good references, by far the best price. Plus they
> actually ran a camera through the existing line and didn't charge me a
> cent. The other guys made their bids on the basis of inspection from
> above, only.
>
> Yesterday afternoon, when I faxed the bid, it was dry, but it rained
> something fierce overnight. There had been relatively little rain here
> until last night. Now the ground is going to be saturated. They have to
> dig at least 4 holes to get down to the existing clay lateral for
> connections and access to do the trenchless.
>
> What affect does the rain have on all this? Thanks for your answers.



Similar ThreadsPosted
broken sewer lateral May 4, 2008, 5:37 pm
Sewer line replacement question. October 26, 2008, 9:09 am
HELP!!! Leak in water service lateral! January 29, 2008, 1:38 pm
FOLLOW UP: Leak in water service lateral January 30, 2008, 9:58 pm
Is Your Spa Cover Too Heavy? January 4, 2007, 11:26 am
How to cut heavy fence wire? September 13, 2005, 10:25 pm
Removing heavy rust ? ? > July 29, 2006, 9:08 am
How to move a heavy shed? March 2, 2008, 8:14 am
Securing heavy electrical cable August 9, 2005, 3:41 pm
Roof leaks only during heavy rain October 14, 2005, 4:32 am

Contact Us | Privacy Policy