Is it required that I run rigid conduit inside a building from the meter
base to the entrance panel? The run from the meter to the entrance
panel will be at least 20 feet. Locating this outside the building
would be very difficult.

Thanks,
Boden

AppliancePartsPros.com, Inc.
Posted by RBM on April 24, 2007, 6:31 am


The NEC doesn't require it, but some local jurisdictions do




> Is it required that I run rigid conduit inside a building from the meter
> base to the entrance panel? The run from the meter to the entrance panel
> will be at least 20 feet. Locating this outside the building would be
> very difficult.
>
> Thanks,
> Boden



Posted by John Grabowski on April 24, 2007, 7:33 am



> Is it required that I run rigid conduit inside a building from the meter
> base to the entrance panel? The run from the meter to the entrance
> panel will be at least 20 feet. Locating this outside the building
> would be very difficult.
>
> Thanks,
> Boden


If you install overcurrent protection at the meter, conduit may not be
required. Other variables may come into play such as if the run will be
subject to abuse. Without overcurrent protection article 230.6 may be
applicable where the conduit must be encased in concrete. You should check
with the power company and the authority having jurisdiction for this
question.


Posted by Joe on April 24, 2007, 10:14 am


> Is it required that I run rigid conduit inside a building from the meter
> base to the entrance panel? The run from the meter to the entrance
> panel will be at least 20 feet. Locating this outside the building
> would be very difficult.
>
> Thanks,
> Boden

Better check your local building codes. In our locale the maximum
allowed distance from meter to service panel is 5' and it must be in
conduit. In any event, the building inspector people can be very
helpful with good ways to do things that meet code requirements. Good
luck.

Joe


Posted by Boden on April 24, 2007, 12:50 pm


Joe wrote:
>
>>Is it required that I run rigid conduit inside a building from the meter
>>base to the entrance panel? The run from the meter to the entrance
>>panel will be at least 20 feet. Locating this outside the building
>>would be very difficult.
>>
>>Thanks,
>>Boden
>
>
> Better check your local building codes. In our locale the maximum
> allowed distance from meter to service panel is 5' and it must be in
> conduit. In any event, the building inspector people can be very
> helpful with good ways to do things that meet code requirements. Good
> luck.
>
> Joe
>
Very rural area, no codes, no inspections and the power company seems
disinterested. All they want is a meter box to connect to.

What I want is to apply best practices, so I think I will go with rigid
conduit since abuse is unlikely and I don't want to deal with concrete.

Thanks all.

Page 1 of 2       1 2 > last >>
Similar ThreadsPosted
abs/pvc connection August 22, 2006, 5:55 pm
ROI for Sewer Connection June 16, 2005, 1:00 am
Dishwasher connection December 29, 2005, 3:02 pm
house AC connection February 26, 2006, 4:45 pm
Add One Neutral Bus Connection ? May 24, 2006, 10:48 pm
Galvanized to PVC Connection August 2, 2006, 1:55 am
help with drain connection? August 24, 2006, 12:05 am
Ceiling connection December 31, 2006, 2:52 pm
Ceiling connection December 31, 2006, 3:23 pm
toilet connection June 22, 2008, 6:10 pm

Contact Us | Privacy Policy

XML SitemapXML Sitemap