Posted by Boden on April 24, 2007, 12:50 pm
Joe wrote:
>
>>Is it required that I run rigid conduit inside a building from the meter
>>base to the entrance panel? The run from the meter to the entrance
>>panel will be at least 20 feet. Locating this outside the building
>>would be very difficult.
>>
>>Thanks,
>>Boden
>
>
> Better check your local building codes. In our locale the maximum
> allowed distance from meter to service panel is 5' and it must be in
> conduit. In any event, the building inspector people can be very
> helpful with good ways to do things that meet code requirements. Good
> luck.
>
> Joe
>
Very rural area, no codes, no inspections and the power company seems
disinterested. All they want is a meter box to connect to.
What I want is to apply best practices, so I think I will go with rigid
conduit since abuse is unlikely and I don't want to deal with concrete.
Thanks all.
|