Posted by DanG on February 27, 2007, 9:30 pm
Dirt.
To be a bit more technical- select fill compacted to a Proctor
density of about 95%. Footings for the perimeter, pour the side
walls monolithically with the stairs or poured separately,
stripped, filled with select.
______________________________
Keep the whole world singing . . . .
DanG (remove the sevens)
dgriff237@7cox.net
> My front entry consisted of three concrete steps onto a landing.
> The whole business is about 3' high with the landing about 4' x
> 4'. I like to extend the existing staircase horizontally form an
> existing width of 4' to 8'. I could pour the new concrete to
> match but that's a lot of concrete to mix. How do you guys do
> this? Use concrete blocks, dirt or some kind or rubble below the
> landing and poured on top of it?
>
>
>
|